Membrane and new framing. |
 |
|
 |
|
 |
|
 |
New insulation over membrane. Vapour barrier was installed. |
 |
Drywall installation process. |
 |
|
 |
|
 |
cutting holes for electrical switches. |
 |
Ready for sanding. |
 |
|
 |
|
 |
|
 |
|
|
 |
 |
We used steel studs over pressure treated plywood to frame basement. |
 |
"New steel stud framing over membrane." |
 |
|
 |
Pink panther insullation was installed over new electrical wires. |
 |
"New steel stud framing with insulation." |
 |
|
 |
All basement was drywalled and finished in a few days.
"Fixing track light." |
 |
"Final look." |